
Plumbing, Fire Sprinkler and Gas Inspections
Plumbing
City of Vancouver Building By-law Part 7, Plumbing Services is the enforcement code references in which the District Plumbing Inspector’s use to inspect permitted projects, and related plumbing enforcement situations.
Plumbing Inspection Stages for a typical new construction of a building or house:
- Sub-soil Drainage Piping
- Underground Sanitary and Storm Drainage System Piping
- Sewers
- Water Service
- Rough-in Sanitary/Storm Drainage System Piping
- Rough-in Water Distribution System Piping
- Rough-in Tub and Shower Installation
- Plumbing Fixtures
- Final Inspection
For Residential Houses: Damp proofing of concrete foundation wall is inspected by the District Plumbing Inspector
Plumbing Inspection Stages for a typical Interior Alteration of a Premise or Residence:
- Rough-in Sanitary/Storm Drainage System Piping
- Rough-in Water Distribution System Piping
- Plumbing Fixtures
- Final Inspection
Pressure Reducing Valve Sizing
(12kb)
Water Pipe Sizing Table
(17kb)
Plumbing Requirements for Dental Offices
(31kb)







