link to page content
    
  
  
Engineering Home
  Film & Events      Parking      Solid Waste      Streets      Sustainability      Transportation      Water & Sewers      Search Engineering
 

Greenways Program

Home

City Greenways
 Arbutus
Carrall Street
 Central Valley
 Downtown Historic
 Eastside Crosscut
 Fraser River
 Granville
 Lagoon
 Midtown
 North Arm
 Ontario
 Parkway
 Port Side
 Ridgeway
 Seaside
 Spirit Trail

Neighbourhood
Greenways

Other Greenways
Initiatives

Frequently
Asked Questions

Feedback


 

City Greenway: Arbutus

The Arbutus/11th Avenue Greenway links Kitsilano High School and Connaught Park with Lord Tennyson Elementary School from Vine to Maple Streets. The section of greenway from Vine to Arbutus Streets on 11th Avenue has been completed, and a pedestrian activated intersection installed at 11th Avenue and Arbutus Street.

11th Avenue/Arbutus Greenway Construction

Starting in late June 2006, City crews will be constructing the greenway on 11th Avenue between Maple Street and 50 m to the west. This is on the site of the current closure. The duration of the street reconstruction work will be approximately 9 weeks, and the landscaping and street lighting work will be completed in the fall of 2006.

The scope of work includes:
1) new curb on the west side of Maple Street at 11th Avenue to formalize the closure;
2) new cul-de-sac at the west end of the closure;
3) new sidewalk at selected locations;
4) new trees and planting areas; and
5) upgrades to the existing street lighting system and installation of new pedestrian lights.

During this period of construction, every effort will be made to minimize the impact of the work. We will try to maintain access to residences and businesses at all times, remove parking and vehicle restrictions as soon as possible and provide updates on the work as appropriate.

Thank you in advance for your patience and cooperation during construction. If you have any questions or concerns about the work, please contact Linda Chow at 604.873.7305 or by email at linda.chow@vancouver.ca.

Map

History

After consultation with owners and residents in the area, a temporary closure for the greenway at 11th Avenue and Maple Street was installed on November 15, 2004.   This closure has undergone a 6 month review with the neighbourhood to determine whether it should be made permanent.  On September 15, 2005 City Council approved the greenway closure.

For further information, please contact Linda Chow, Greenways Engineering, 604.873.7305.