Print
Rendering of Granville Bridge Connector

Final phase of Granville Bridge Connector engagement starts today

January 24 2020 –

Starting today, people can share their final feedback on the Granville Bridge Connector.

After receiving almost 8,000 survey responses from the public, City staff are recommending the “West Side Plus” design option for the Granville Bridge Connector. This design was by far the most popular option with the public after two previous rounds of engagement. 

Granville Bridge Connector

People can learn more about the proposed design by attending an open house or registering for a workshop. The public are also invited to provide feedback by taking an online survey.

Read the engagement details

Attend an open house

Friday, January 24, 12pm to 7pm
CityLab, 511 W Broadway

Saturday, January 25, 12pm to 5pm
CityLab, 511 W Broadway

Tuesday, January 28, 4pm to 8pm
Central Library Promenade, 350 W Georgia

Drake Street Upgrades

People can also give feedback on a proposed design for upgrades to Drake Street, which provides provide a critical link to Granville Bridge.

Provide feedback

After hearing from the public on these two projects, staff will make final revisions before presenting designs for both to City Council for a decision later this year.