

We’re carrying out critical structural repairs and seismic upgrades to Cambie Street Bridge to ensure this infrastructure continues to serve us well.
These upgrades include:
- Bridge deck rehabilitation
- Deck joint seal and concrete repairs
- South pedestrian staircase repairs
- Seismic upgrades under the south side of the bridge
Cambie Street Bridge upgrades were completed in March 2022
Details
Location
- Cambie Street Bridge
Duration
Fall 2021 to spring 2022
Work hours
Monday to Saturday: 7am to 5pm, extended hours as needed
Weekends: as needed