The Killarney Community Centre Arena Modifications project will consist of the following work:

  • The existing supply fan will be rotated by 180 degrees to reverse the airflow.  This will prevent the fan from blowing hot air into the arena and will instead remove the old stale air from the arena.
  • The existing backdraft dampers at the north end of the arena will be removed and will be replaced with a filter bank.  This will allow fresh air into the arena.
  • In order to increase the performance of the dehumidifier the supply ductwork for the dehumidifier will be extended.  This will eliminate the short cycling of the unit and allow for a high percentage of dehumidification.

The Vancouver Park Board will design, tender, and provide construction management services for the duration of the project.

Photos

Click thumbnail to view larger image


March 3, 2011
Ductwork dropped off
for painting




March 7, 2011
Existing dehumidifier
ductwork to be
extended



March 7, 2011
Existing supply fan
to be rotated




March 7, 2011
Existing backdraft
dampers to be
removed and
replaced with a
filter bank

April 11, 2011
Construction underway
on newly rotated
supply fan


April 11, 2011
Newly extended
dehumidifier ductwork


April 12, 2011
Installation of new
filter bank


Project Location