Burrard Street Corridor Project

We are upgrading critical water, sewer, and transportation safety infrastructure on Burrard Street between Davie Street and 17th Avenue from February 2016 to late 2017.

What we're upgrading

The upgrade will:

  1. Improve safety at the Burrard-Pacific intersection, the second-highest collision location in Vancouver
  2. Improve connections to enable people to walk on both sides of the bridge
  3. Replace aging infrastructure like sewer and water utilities, and roads and sidewalks
  4. Combine routine maintenance to minimize the overall impact to communities

We will make every effort to reduce traffic impacts and minimize the construction period.

Three sections

The upgrade has three sections:

  1. Burrard Bridge and the Burrard-Pacific intersection
  2. Burrard Street, from Davie Street to Pacific Street
  3. Burrard Street, from Cornwall Avenue to 17th Avenue

Learn about each section of work

Burrard Bridge and Pacific Street Intersection Upgrades

Rehabilitating the bridge, and improving safety and connections for people using the bridge from the intersection. Project duration: January 2016 to mid-2017.

Burrard Street (Davie to Beach) Water and Sewer Main Replacement Project

Replacing the water main, installing a separated sewer main, and repaving the road surface. Project duration: January 2016 to late 2016.

Burrard Street (Cornwall to 17th) Water and Sewer Main Replacement Project

Replacing the water main and sidewalk, installing a separated sewer main, and repaving the road. View traffic changes during construction. Project duration: February 2016 to late 2017.

Find out what's happened so far

Burrard Bridge

Traffic advisory: Burrard-Pacific intersection closed this weekend

June 10 2016 - The Burrard-Pacific intersection will be closed for asphalt removal and repaving from 7:00am Saturday, June 11 to 8:00pm Sunday, June 12.

Road barricades around a construction site

City plans street use for busy construction and special event season

April 27 2016 - Summer is a busy time for construction work and special events, as long days and good weather allow work to happen more quickly. Find out what areas may be affected.

Past updates

Get updates

* Indicates required fields

Contact us about the upgrade

Do Nguyen, Community Liaison

  604-673-8458