Submission Requirements and Checklists
Enquiry Centre
- Addition or New Construction or Renovation (outright) - One and Two Family Dwellings
(472kb) - 07/05
- Addition or Renovation Checklist - One Family Dwelling (RS Zones)
(85kb) - 05/10/10
- Converting Basement to Crawl Space
(99kb) - 12/08/08
- Demolition of Commercial or Industrial Buildings
(38kb) - 12/09/08
- Demolition of One & Two Family Dwellings
(40kb) - 05/10/10
- Optional Deconstruction Program:
- Deconstruction Brochure -
(734kb) - Deconstruction Requirements - One & Two Family Dwellings
(447kb)
- Deconstruction Brochure -
- Optional Deconstruction Program:
- Decks in RS Zones
(49kb) - 07/08/08
- Garages and Carports, Accessory to One and Two Family Dwellings
(278kb) - 10/03
- Guide for Residential Fences, including Overheight Fences, Arbours & Trellises
(150kb) - 04/23/07
- In Ground Swimming Pools - Field Review
(36kb) - 09/27/11
- Laneway Housing
(90kb) - 07/23/09
- Re-piping Domestic Water System
(34kb) - 09/27/11
- Tenant Improvement to T.I.P.S Buildings and Field Review Applications
(44kb) - 10/12/11
- For applications with non-grease-laden cooking proposed, see the K3 form located below
Processing Centre - Building
- Balcony Enclosures on Multiple Dwelling Buildings
(34kb) - 09/16/05
- Building Envelope Repairs
(39kb) - 06/07/11
- Certified Professional Application
- Effective March 1, 2012 - for Part 3 New Construction, see the ASHRAE documentation requirements located below
- Change of Use of an Existing Building Requiring Major Upgrading
(40kb) - 04/17/08
- Construction of New Buildings/Addition to Existing Buildings
(46kb) - 02/06/12
- Effective March 1, 2012 - for Part 3 New Construction, see the ASHRAE documentation requirements located below
- K1- Restaurants or Kitchen Exhaust Systems
(77kb) - 04/10/07
- K2 - Kitchen Ventilation Details Checklist
(98kb) - 04/10/07 - Solar Hot Water Heating Systems Retro-Fit Checklist (1 & 2 Family Dwellings)
(30kb) - 05/27/11 - Solar Hot Water Heating Systems (Multiple Dwelling and Commercial Buildings)
(33kb) - 05/27/11
Processing Centre - Development
- All RT Zones
(49kb) - 09/21/11
- Balcony Enclosure in Existing Buildings
(30kb) - 09/21/11
- Change of Use
(28kb) - 09/21/11
- Operational Letter Requirements
(28kb) - 04/05/11
- Operational Letter Requirements
- Child Care Development Permit (Change of Use Checklist)
(87kb) - 07/15/08
- Commercial and Industrial Buildings
(53kb) - 09/21/11
- First Shaughnessy
(51kb) - 10/25/11
- Major Applications
(54kb) - 09/21/11
- Minor Amendment To a Development Permit
(30kb) - 09/21/11
- Multiple Dwellings
(53kb) - 09/21/11
- One and Two Family Dwellings - Conditional
- One and Two Family Dwellings (RS-1A, RS-1B, RS-2, RS-4)
(53kb) - 09/21/11 - One Family Dwelling (RS-1, RS-6, RS-7) Located on their own Individual Site
(56kb) - 09/21/11 - One Family Dwelling (RS-3, RS-3A, RS-5) Located on their own Individual Site
(59kb) - 09/21/11
- One and Two Family Dwellings (RS-1A, RS-1B, RS-2, RS-4)
- One and Two Family Dwellings - Outright
(58kb)
- 09/05/08
- Outdoor Patio Seating for an Existing Restaurant or Retail-Limited Food Service (max. 16 seats)
(28kb) - 09/21/11
- Overheight Fences, Arbours, etc., in Residential Zones
(28kb) - 09/21/11
- Painted or Inscribed Murals
(27kb) - 09/21/11
- RA-1 District
(47kb) - 09/21/11
Processing Centre - Subdivision and Strata
Subdivision |
Strata |
Other Guides and Checklists
- ASHRAE 90.1 - 2007 Documentation Process
(Part 3, New Construction)
- Tutorial - ASHRAE 90.1 2007 Process
(5.76mb) - ASHRAE 90.1 2007 Checklist
(220kb)
- Tutorial - ASHRAE 90.1 2007 Process
- Building Encroachments Guide
(17kb) - Childcare Centre - Steps for Establishing a Childcare Centre in Vancouver in an Existing Building
(118kb)
- K3 - Commitment Not To Create Grease-Laden Cooking Vapours
(36kb) - 04/10/07
- Structural Concept Review Checklist
(32kb)
For more information, please call the Enquiry Centre at 604.873.7611 or 604.873.7613.
[top]
