Southeast False Creek Home

About the Neighbourhood

Ownership Information

Documents

Rezoning Documents

Development Applications and DPB Decisions

Public Involvement

Related Links

Join our Mailing List

Contacts


Southeast False Creek and Olympic Village Project Office

Planning Home

Community Services Home

Get Adobe Reader
To view/print PDFs,
Adobe Reader is required
www.adobe.com

 

Southeast False Creek: About the Neighbourhood

Vision | Guiding Principles | Neighbourhood Precincts (The "Yards") | History | Summary Sheet


Vision

vision vision

Southeast False Creek (SEFC) is envisioned as a community in which people live, work, play and learn in a neighbourhood that has been designed to maintain and balance the highest possible levels of social equity, livability, ecological health and economic prosperity, so as to support their choices to live in a sustainable manner.

SEFC will be a mixed-use community, with a focus on residential use, developed at the highest density possible while meeting livability and sustainability objectives. This complete community will ensure goods and services within walking distance and housing that is linked by transit and in proximity to local jobs.

The public realm in SEFC, which includes open space, parks, streets, and pathways, will connect the entire site and link the adjacent neighbourhoods of South False Creek, Mt. Pleasant, the False Creek Flats, and CityGate. Movement within the site will be through a network of paths and streets designed for pedestrians, cyclists and transit.

Development will continue up to and beyond the Olympic Games. When fully built out, SEFC will have 6.3 million square feet of residential development, with family housing a priority. The housing stock will be comprised of approximately 6,600 units with an estimated total population ranging from 11,000 – 13,000 people.

The built form will celebrate the heritage of the SEFC site through the revitalization of the Salt Building and its designation for public use. The buildings will be designed to be healthy, livable, and efficient in their use of energy resources and water.

The SEFC neighbourhood will provide a wide range of parks and recreational experiences along the waterfront, and will include shoreline improvements and completion of the Seaside pedestrian-bicycle route. Parks and open space will be required to meet ecological objectives, including re-establishment of wildlife habitat, and private and community gardens will be encouraged.

In some areas of the site, demonstration projects in advanced environmental technologies, such as renewable energy supplies, water management, green building design and urban agriculture are being explored.

projects projects projects

[top]


Guiding Principles

  1. Implementing Sustainability: SEFC should promote the implementation of sustainable development principles in an urban setting.
  2. Stewardship of Ecosystem Health: The SEFC plan should improve the health of the False Creek Basin and encourage resource conservation and waste reduction.
  3. Economic Viability and Vitality: SEFC development should ensure viability without subsidy and encourage a vibrant and vital community.
  4. Social and Community Health: SEFC should be a livable, complete community supporting social networks and enhances quality of life for all in the neighbourhood.

Neighbourhood Precincts (The "Yards")

map Works Yard Ship Yard Rail Yard

Click on icons above to view more infomation.

[top]


History

history history history

The Southeast False Creek (SEFC) study area comprises a total of approximately 80 acres (32 hectares) of former industrial land near downtown Vancouver. The majority of the land north of 1st Avenue is City owned. The study area also includes over 30 acres (12.1 hectares) of privately owned land, between 1st Avenue and 2nd Avenue, to the south, and between 1st Avenue, Quebec Street, Terminal Avenue, and Main Street to the east.

SEFC has been an industrial area since the late 1800’s. Its industrial uses have included sawmills, foundries, shipbuilding, metalworking, salt distribution, warehousing, and the city’s public works yard (Cambie Yard). The original shoreline was near 1st Avenue and the land area north of it is comprised of fill from many sources, including Grandview Railway Cut and ash from a former incinerator in the Cambie Yard.

More on historical overview.


Summary Sheet

View the summary sheet (PDF, 190KB) for further background information, a listing of key amenities and quick statistics about the SEFC site.

[top]

 

 


Questions or Comments? E-mail: sefc@vancouver.ca


© 2010 City of Vancouver

 

City of Vancouver