CRAB Park playground

CRAB Park at Portside

Sea Creatures at CRAB Park is a special art project featuring the work of artists representing local Nations and Urban Indigenous communities:

  • Chrystal Sparrow (Musqueam Indian Band)
  • Janice George & Buddy Joseph (Squamish Nation)
  • Candace Thomas (Tsleil-Waututh Nation)
  • Bracken Hanuse Corlett (’Wuìk̓inux̌v and Klahoose Nations)

Enjoy the adventure of discovering these sea creatures hidden among the playground panels and splash pad surface at CRAB Park.

The Vancouver Park Board has completed the playground renewal and refresh of the splash pad at CRAB Park. 

The new playground features:

  • Play structure with slides
  • Tot swing set
  • Bouncy riders
  • Carousel
  • Rubber surfacing
  • Benches, tables with seating, and trees
  • Refreshed splash pad with new paint and paved surfacing

The playground and spray park opened in summer 2025.

The Vancouver Park Board is grateful to Port of Vancouver  and DP World  for their financial contribution towards this project.

Fieldhouse and washroom update

As part of our citywide Parks Washroom Strategy (3.5 MB), we piloted 2 new Portland Loos and installed a new drinking fountain at CRAB Park at Portside.

The fieldhouse, which was closed in October 2019, was demolished because of its condition. The Portland Loos and demolition work was funded by the 2019-2022 Capital Plan New Washrooms budget.

We are continuing to monitor the Portland Loos.