We’re upgrading sewer infrastructure along Highbury Street between West 31st Avenue and the laneway south of West 33rd Avenue, including a section that runs underneath Memorial West Park.
The existing sewer system will be replaced with a separated and larger-capacity system, with one pipe for rainwater runoff and another pipe for sewage.
Trenchless sewer construction
To minimize impacts to residents, park facilities, and mature trees, we’ll use trenchless methods to install the upgraded sewer system between W 31st and W 33rd Avenues.
This underground method minimizes surface disruption. We'll dig access pits at either end of the park and install the sewer between them.
What's happeningConstruction underway until spring 2026
Starting June 2025, we’ll begin sewer upgrade work.
Expect street and lane closures around Memorial West Park during construction. We'll maintain access for local residents and businesses where possible.
Memorial West Park and its facilities, including the baseball field, community centre, and lawn bowling green, will remain open. Watch for temporary detours to maintain safety for all.
Details
Location
Duration
- Summer 2025 to spring 2026
Work hours
Monday to Friday: 7am to 7pm, with extended hours as needed.